Requirements For Processing Planning Permission

REQUIREMENTS FOR PROCESSING PLANNING PERMISSION


 

  1. Signed Application Letter (Typed)
  2. Copy of Certificate of Occupancy/ Lease Agreement (Planned Areas)
  3. Copy of Customary Land Ownership endorsed by a District Head (Unplanned Areas)
  4. Two sets of Preliminary Drawings [Architectural, Structural, Mechanical & Electrical]/ Draft Structural Calculation Sheets for Preliminary Approval Only
  5. Three sets of Architectural Working Drawings & Details, Sealed, Stamped, and endorsed by the Architect (All Developments)
  6. A copy of the Architect’s Professional Practice License indicating Project Name and endorsed by him (All Development)
  7. Three sets of Structural Working Drawings & Details, Sealed, Stamped, and endorsed by the Engineer (Story Buildings Warehouses, Petrol/Gas Stations & others with special Structural requirements)
  8. Soil Investigation Report (Multi-Story Developments that exceeds Three Floors)
  9. Copy of the Structural Sheets, Letter of attestation of Design, Sealed, Stamped, and Endorsed by the Engineer (Developments listed on 7 above)
  10. Three sets of Mechanical & Electrical Working Drawings & Details, Sealed, Stamped, and endorsed by their respective Engineers (All Developments)
  11. Copy of Site Analysis Report Prepared by KASUPDA Registered Consultants (All Developments)
  12. Copy of KEPA’s Environmental Impact Assessment (EIA) Approval Certificate (Agricultural, Petrol, Gas Station, Commercial, Industrial, Institutional, Mass Housing and other Major Developments)
  13. Copy of Feasibility/Viability Report Prepared by KASUPDA Registered Consultants (Mass Housing and Other Developments)
  14. Copy of Service Approvals: Fire and Police Reports (Petrol/Gas Stations, Hotels and Multi-Story Developments that exceeds Four Floors)